On a board assembly the screw is usually not the fragile part — the board and the standoff are. Automating the joint means controlling force, not just torque.
At a glanceTypical fastening: M2.0 – M3.0 · single- and dual-platform screw driving and dispensing cells configured per part · built in Dongguan, China since 2011
Most engineers arriving here go straight to one of these:
PCB-mounted screws usually hold one of four things: a heat sink, a shield can, a connector bracket, or the board itself onto a chassis standoff. The screws are commonly M2.0 to M3.0, but the load path matters far more than the size. Driving into a metal standoff has a clear shoulder to stop against; driving into a captive nut pressed into a board relies on the nut's retention, which is exactly the thing that fails when torque is applied too quickly.
Board flex is the second failure mode. A board supported only at its corners will deflect under downward force, and once it deflects, the screw axis moves with it. The result is a screw that starts straight and finishes cross-threaded, or a solder joint that cracks at the pad rather than at the screw. This is why a screw-driving station on a PCBA line is really a fixturing project with a screwdriver attached.
Z-axis force control solves most of it. Driving with a controlled downward force and a float-height / displacement sensor lets the machine detect that the screw has seated and stop, rather than pushing to a torque target and transferring the reaction into the board. Our platforms use the displacement sensor both for seating detection and for catching cross-threaded screws before they do damage.
These are the parameters we need from you to configure a station rather than to guess at one.
Machine screw into a threaded standoff, self-tapping into plastic, or screw into a captive nut — each needs a different seating strategy and stopping rule.
Identify where the board can be supported from below. Under every screw position is ideal; under the corners is the minimum.
For ESD-sensitive assemblies, specify grounding and dissipative tooling so the screwdriver does not become the ESD event.
If the unit uses more than one screw, the machine can call different programs per position — but the operator loading the feeder needs a plan for it.
Board screws are often driven inside an existing conveyor, which changes the machine footprint and the handling, not the driving head.
Send the part, the screw size and the torque window and we will come back with a configuration and a cycle-time estimate.