Enter your assembly and your screw driving parameters. The calculator returns the cycle time per unit, the output per station, and how many stations the line needs to reach a target output. It runs entirely in your browser — nothing is uploaded, no sign-up, no email required.
MethodCycle time = screws per unit × (drive time + positioning
time) ÷ stations · output per station = 3,600 s × uptime ÷ cycle time
· platform defaults M1.7–M5.0 screws at
0.37–0.41 s per screw.
Defaults describe our standard platform: M1.7–M5.0 screws, ±0.02 mm repeat positioning, 0.37–0.41 s per screw. Replace them with your own values.
| Cycle time per unit | — s |
|---|---|
| Output per station | — units / hour |
| Screws driven per station | — screws / hour |
| Stations needed for target | — stations |
| Output with the stations you entered | — units / hour |
| Output per shift | — units / shift |
cycle time per unit = screws per unit × (driving time per screw + positioning time per screw)
output per station = 3600 ÷ cycle time per unit × uptime
stations needed = ceiling( target output ÷ output per station )
The model is deliberately simple: it treats positioning and driving as the only time elements and applies a single uptime factor. Real stations also lose time to screw feeding, part loading and changeover. Use the result to compare configurations, then confirm the number on the machine datasheet for your actual part.
The defaults are the published figures for our own platforms — see automatic screw driving machines, or the guide to cycle time calculation for the longer explanation, including which time elements people usually forget. If you have not chosen the platform yet, start with how to choose an automatic screw driving machine or run the machine selector.