Automatic screw driving & non-standard automation equipment — Manufacturer since 2011
CB CBZINChengbo Intelligent Technology
Home/Guides/Cycle-time calculation
Technical guide

How to calculate screw driving cycle time

Driving a screw takes about 0.4 seconds. Getting to the next screw usually takes longer — which is why cycle-time estimates built on screw count alone are consistently optimistic.

At a glanceDriving 0.37–0.41 s per screw on the arm platform; add for long threads and hard materials. · Travel Short moves are acceleration-limited, not speed-limited. Model accel and decel, not a constant velocity.

Most engineers arriving here go straight to one of these:

Technical guide

Build the estimate in three parts. First, driving: on our arm platform that is 0.37–0.41 s per screw, higher for long threads or hard materials, lower for short engagements. Second, travel: the time for the head to move from one screw to the next, which is total path length divided by the achievable axis speed — nominal speed is up to 800 mm/s per axis, but acceleration and deceleration on short moves mean the effective average is much lower, and the right way to model a short zig-zag is to treat each move as accel-and-decel rather than as a constant velocity run. Third, everything else: screw collection or feed presentation, fixture clamping and unclamping, and part load and unload.

The dominant error in most estimates is ignoring the third part. A station that drives twelve screws in five seconds can still have a thirty-second cycle because the part has to be loaded, clamped and unloaded around it. If the part is already on a conveyor inside an in-line station, that cost mostly disappears; if an operator is feeding a bench machine, it usually decides the cycle.

Tool changes and orientation changes have the same effect. Whenever the head must approach from a different angle, an articulated arm spends time reorienting, and a Cartesian gantry may need the fixture to reposition the part. Counting the number of distinct approach orientations on a part is often more informative than counting screws, because groups of screws sharing one orientation are cheap and each change of orientation is expensive.

Last updated 2026-11-20. Screw range, torque and cycle-time figures reflect the current published platform specifications.

What to specify

Key points to take away

The practical conclusions from the sections above.

Driving

0.37–0.41 s per screw on the arm platform; add for long threads and hard materials.

Travel

Short moves are acceleration-limited, not speed-limited. Model accel and decel, not a constant velocity.

Feed presentation

Collecting or presenting the screw adds time per screw and is easy to overlook.

Clamping and handling

Load, clamp, unclamp and unload usually exceed all the driving time combined on a bench station.

Orientation changes

Count distinct approach orientations, not screws — each change costs reorientation or a fixture move.

Multi-spindle

Screws sharing a plane can be driven simultaneously; this is the single largest cycle-time lever when screws come in groups.

Common questions

Frequently asked questions

What cycle time can I realistically expect?
Take the screw count once for the driving term, then add the travel term from the actual screw layout, then add handling. Machines that drive in under ten seconds often have cycles three or four times longer once handling is counted.
How much faster is a multi-spindle head?
For screws on the same plane, a multi-spindle head drives them simultaneously, so the driving term divides roughly by the spindle count. Travel between groups remains.
Does a robot arm or a gantry give a shorter cycle?
It depends on the part. An arm reorients without moving the part, which is fast where joints are on several faces. A gantry is faster and stiffer where all joints share one approach direction.
Keep reading

Related pages

Not sure which applies to you?

Describe the part and the joint and we will tell you which configuration fits — or whether you do not need a machine at all.