Home / Answers / How do I calculate screw driving cycle time?
Short answerCycle time ≈ screws × (0.37–0.41 s) + loading + fixture indexing + inspection. A 12-screw part is therefore 4.4–4.9 s of driving, but 15–25 s of real cycle on a manual-load bench.
The mistake is quoting the driving time to a production manager. They plan on the real cycle, and if you hand them 4.9 s they will build a business case that fails in week one.
The calculator on this site does the arithmetic including heads and loading; it does not guess your fixture time, so enter it honestly.